The above mentioned limits shall not be exceeded and shall be recorded. The manufacturers rated capacity of the crane at the radius at which the lift will be made shall be divided by four before hoisting employees. Prelift plans which show boom angle and maximum intended load shall be prepared for each group of lifts to ensure that employers meet the applicable requirements of the subject instruction. This is in response to your letter of December 21, 1983, concerning the prelift plans required in OSHA Instruction STD 1-11.2B.Ĭranes may be used to hoist and suspend employees on a work platform or to provide access and egress in unique work situations when such action results in the least hazardous exposure to employees.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |